Market Forge Industries Standard Depth8192 Spezifikationen

Stöbern Sie online oder laden Sie Spezifikationen nach Öfen Market Forge Industries Standard Depth8192 herunter. Market Forge Industries Standard Depth8192 Specifications Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 14
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 0
8100 & 8300 SERIES
FULL SIZE GAS CONVECTION OVENS
INSTALLATION - OPERATION - MAINTENANCE
44 Lakeside Avenue, Burlington, Vermont 05401 USA
Telephone: (802) 658-6600 Fax: (802) 864-0183
www.mi.com PN 14-0398 Rev A (9/14)
© 2014 - Market Forge Industries Inc.
MODELS
8100 - single standard depth oven
8192 - double standard depth oven
8300 - single bakery depth oven
8392 - double bakery depth oven
Seitenansicht 0
1 2 3 4 5 6 ... 13 14

Inhaltsverzeichnis

Seite 1 - 8100 & 8300 SERIES

8100 & 8300 SERIESFULL SIZE GAS CONVECTION OVENSINSTALLATION - OPERATION - MAINTENANCE44 Lakeside Avenue, Burlington, Vermont 05401 USATelephone:

Seite 2 - Installation checked by

8INSTALLATIONAssembly to Legs or StandINSTRUCTIONS FOR OPTIONAL BOTTOM SHELF AND RACK GUIDE ASSEMBLY:Assemble as follows: (For 8100 & 8300 Models

Seite 3 - IMPORTANT

9INSTALLATIONStacking the OvensASSEMBLING STACKED OVEN1. Match holes on the legs with oven bottom base and screw with bolts provided.2. Set top oven

Seite 4 - Introduction

10OPERATIONStart UpFLEXIBLE COUPLING, CONNECTORS AND CASTERSIf the unit is to be installed with exible couplings and /or quick-disconnect ttings,

Seite 5 - Oven Location

11OPERATIONControl PanelOPERATING INSTRUCTIONS1. Check that power is available to the oven2. Arrange shelf positions according to the item to be coo

Seite 6 - Service Connections

12MAINTENANCECleaningAny piece of equipment works better and lasts longer when maintained properly. Cooking equipment is no ex-ception. Your M

Seite 7

Your Service Agency’s Address:ModelSerial numberOven installed byInstallation checked by

Seite 8 - Electric and Gas Connections

TABLE OF CONTENTSINSTALLATIONIntroduction ... 2Oven Location ...

Seite 9 - Assembly to Legs or Stand

2INSTALLATIONIntroductionIMPORTANT INFORMATIONSafe and satisfactory operation of your equipment de-pends on proper installation. Installation m

Seite 10 - ASSEMBLY INSTRUCTIONS

3INSTALLATIONOven LocationAIR SUPPLY AND VENTILATIONThe area in front of, around and above the appliance must be kept clear to avoid any obstruction o

Seite 11 - Stacking the Ovens

4INSTALLATIONService Connections8100 & 8192 STANDARD DEPTH OVENSFigure 1 SERVICE CONNECTIONSG Gas Connection - 3/4” (20mm) N.P.T. on the right han

Seite 12 - Start Up

5INSTALLATIONService ConnectionsFigure 2 8300 & 8392 BAKERY DEPTH OVENSSERVICE CONNECTIONSG Gas Connection - 3/4” (20mm) N.P.T. on the right hand

Seite 13 - Control Panel

6INSTALLATIONElectric and Gas ConnectionsELECTRICAL CONNECTIONOven requires a 120 volt supply to operate the ignition system and blower. The s

Seite 14 - Cleaning

7INSTALLATIONAssembly to Legs or StandCASTER INSTALLATION ON LEGSIf casters are provided, match holes on the caster with holes on the oven bottom base

Kommentare zu diesen Handbüchern

Keine Kommentare